| CF-1R | Certificate of Compliance | |
| CF-1R Alt | ADD Certificate of Compliance | |
| CF-1R Add | ALT Certificate of Compliance | |
| CF-6R-Mech-04 | Space Condidtioning Systems, Ducts and Fans | |
| CF-6R-Mech-20 | Duct leakage Test - Completely New or Replacement Duct System | |
| CF-6R-Mech-21 | Duct Leakage Test - Existing Duct System | |
| CF-6R-Mech-22 | HSPP/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test | |
| CF-6R-Mech-23 | Verification of High EER Equipment | |
| CF-6R-Mech-25 | Refrigerant Charge Verification - Standard Measurement Procedure | |
| CF-6R-Mech-26 | Refrigerant Charge Verification - Alternate Measurement Procedure | |
| CF-6R-Mech-27 | Maximum Rated Total Cooling Capacity | |
| CF-6R-ENV-20 | Building Envelope Sealing | |
| CF-6R-ENV-21 | Quality Insulation Installation (QII) Framing Stage Checklist | |
| CF-6R-ENV-22 | Quality Insulation Installation (QII) Insulation Stage Checklist | |
| MasterWorksheet | Blank Worksheet |
Required Software for PDF: Windows XP – Adobe Reader 8; Apple Mac with OS X
Required Software for Excel: Excel, Open Office, or Google Docs

